New Building Pictures
|
|
|
| We are breaking ground....digging footers....laying out the plumbing..... | Heavy Equipment at work.... |
![]() |
![]() |
| The long awaited Building Permit | Digging Footers..... |
![]() |
![]() |
| Plumbing going in....footers being poured.... | What a site..... |
![]() |
|
| Plumbing rough in complete....little did we know the public toilet was wrong.... | Strategizing... |
|
|
|
| Coach Cook.....checking out the beams... | Are you sure you need a office coach? |
| Yes, I'm sure....it's where I hide..... | Proud Coach Looking over the situation.... |
| The driving force.....Captain George..... | Waiting for the concrete..... |
| The Coach gives his approval.... | Concrete crew....is here....yeah! |
| Is he buffing that floor? Looks like a huge floor buffer.... | Theres my tool belt.....don't pour here yet!!!! |
| Concrete almost complete..... | Mrs. Janet....taking a picture..... |
| Whew....my back hurts..... | Concrete crew hard at work..... |
| Ready to pour the second half.... | Wet concrete, no walking here....! |
| Concrete half finished and sealed.... | Lets get r done..... |
| ready to pour the second half... | Ditto..... |
![]() |
|
| If I stand on one foot, it puts less weight on the wet concrete..... | The vertical beams going up...... |
![]() |
![]() |
| Vertical beams going up....it's like a puzzle..... | Looking good..... |
![]() |
![]() |
| Hurry...the rain is coming.....!!! | here is comes.....darn it....well....lets just keep working... |
![]() |
![]() |
| This poncho is not doing nothing but making matters worse.... | This rain wont stop us..... |
![]() |
![]() |
| Little slippery up here....hold on boys..... | Big beams going up .......and it's still raining... |
![]() |
![]() |
| Under flash flood warnings.....lets get back out there boys..... | Beams are up.....is that the sun I see? |
![]() |
![]() |
| Thank God for Hydraulics.....lets just hope they don't give out..... | Looking better and better |
![]() |
![]() |
| finishing up the framework.... | Now it's painting time....I hate to paint.....!!! |
![]() |
![]() |
| I'm looking for the foreman.... | I'm the foreman......can't you tell, as I sit on this ladder.....? |
![]() |
|
| Well I work for cheap....and in the rain too...... | The blue and red paint looks so good..... |
![]() |
![]() |
|
The insulation and walls are going up..... |
Look, it's our first 20ft......yeah!!!! |
![]() |
![]() |
| Trial by errror......lol | The dedicated crew.....Henry Family hard at work..... |
![]() |
![]() |
| The Captain.....chugging right along..... | If this ladder kicks out....I'm in trouble...... |
![]() |
![]() |
| Screwing in metal..... | Not long before dark.....how much more can we get up? |
|
|
|
| We'll just hit it in the morning...... | The inside view ...... |
![]() |
![]() |
| Friday night.....just before dark.....Oct. 2nd 2009 | Oct. 3rd 2009....West wall almost complete |
|
|
|
| Coach Cook and Steve Frye catching the screws as Coach John drops them... | You mean all I have to do is push this little black button....? |
|
|
|
| This insulation is itching my face.......I quit...... | OSHA would have shut us down....no safety lines, no hard hats..... |
|
|
|
| Wrestlers Curto and Satterfield cutting insulation......good job boys... | Yeah....West wall complete.....East wall on Sunday.... |
|
|
|
| Saturday, Oct. 3rd 2009 First wall complete..... | Sunday, Oct. 4th 2009 Second wall complete |
|
|
|
| Showing both walls up.....ends and roof next..... | Time is ticking....season is almost here.....hurry, hurry hurry....rain, rain, go away |
|
|
|
| Everyone pray for no rain......need sunny skies...... | Dalton and WIll working on the last part of the roof....it was so cold..... |
|
|
|
|
Steve Frye.....putting the last sheet of roof metal on ! |
George, Steve, and John carrying the last piece of metal over to put on.... |
|
|
|
|
We did it....the roof is on.....Yeah! |
This was an awesome crew....so cold....but so dedicated... |
|
|
|
|
Lets get the heck off this roof.....it's DONE! |
Now moving to the inside..... |
|
|
|
|
Coffee and Bisquit time.....it's cold in here....turn on the heat.... |
Thanks to Halloway Construction, the walls are framed... |
|
|
|
|
George and John Henry putting up temporary lights... |
Ladies and Gentleman....Elvis has left the building.... |
|
|
|
|
Cleaning crew hard at work on the Floors..... |
Trying to clean up the mess that George Made...... |
|
|
|
|
Mopping the floors and working on the inclosed locker room area.... |
Captain George hard at work.....on the Shed.... |
|
|
|
|
The Heat is ON........WOW...look how big that unit is..... |
Doors to Public Bathroom and Coaches Office |
|
|
|
|
Water Fountain....That's not rust, it's an antique finsih...... |
George's Office...... |
|
|
|
|
Coach's new name plate |
I love it! |
|
|
|
|
The Big Dog's office.....Beware......Enter at your own risk.... |
Hmmmm....wonder if I can fit a cot in here.....then it could be my dog house..... |
|
|
|
|
Girls/Visitor locker Room |
Vanity in Girls/Visitor locker room |
|
|
|
|
Varsity Locker room Lockers |
Varsity Locker Room vanity and urinal |
|
|
|
|
Varsity Locker Room |
Varsity locker room Shower |
|
|
|
|
Varsity Locker room |
Varsity Locker room |
|
|
|
|
Coaches Office |
Coaches Offices |
|
|
|
|
New Rubber Floor |
Rubber Floor |
|
|
|
|
More Rubber Flooring |
More Rubber Flooring |
|
|
|
|
Great shot of the new Rubber Flooring |
|